农村无码免费视频_天天操狠狠干夜夜做_成人aⅤ专区精品无码国产_美女18禁大胸裸身网站_午夜理理伦a级毛片a猛男_一级爱爱片欧美亚洲_国产精品阿v视频_亚洲狼人综合干_玉女阁福利精品导航_国产一区二区欧美日韩

您好,歡迎光臨萊州聚峰機(jī)械有限公司網(wǎng)站! 鄭重聲明 進(jìn)入官網(wǎng)

防止混凝土沾罐快裝快卸是關(guān)鍵

來(lái)源:http://f3328.cn/ 日期:2021-10-30 發(fā)布人:admin
一、隨車(chē)帶上一些備用的減水劑
1、 Bring some spare water reducing agents with you
減水劑是一種在維持混凝土坍落度不變的條件下,能減少拌合用水量的混凝土外加劑,隨車(chē)攜帶,能對(duì)混凝土進(jìn)行很好的調(diào)節(jié)。不過(guò)在加入減水劑的時(shí)候,一定要記得有商砼站化驗(yàn)室的人在場(chǎng),否則混凝土質(zhì)量強(qiáng)度不夠,后果會(huì)很?chē)?yán)重。
Superplasticizer is a kind of concrete admixture that can reduce the mixing water volume under the condition of maintaining the constant slump of concrete. It can be carried with the vehicle and can adjust the concrete well. However, when adding water reducing agent, we must remember that people from the laboratory of commercial concrete station are present, otherwise the quality and strength of concrete are not enough, and the consequences will be very serious.
二、回站檢查儲(chǔ)水罐內(nèi)的水量
2、 Return to the station to check the water volume in the water storage tank
每次出車(chē)卸完料回到站內(nèi)的時(shí)候,檢查儲(chǔ)水罐內(nèi)的水量,確保讓水罐中的水隨時(shí)處于滿(mǎn)罐的狀態(tài),以備不時(shí)之需。
When returning to the station after unloading, check the amount of water in the water storage tank to ensure that the water in the water tank is full at any time in case of emergency.
三、離站前檢查混凝土質(zhì)量
3、 Check the concrete quality before leaving the station
水泥自動(dòng)攪拌車(chē)
可能會(huì)因?yàn)樵系牟煌?,每一?chē)混凝土質(zhì)量都會(huì)有變化。在裝好混凝土離場(chǎng)時(shí),一定要檢查罐內(nèi)混凝土的塌落度以及和易度,小心混凝土的提前凝結(jié)和混凝土離析沉淀。
The quality of each truck of concrete may change due to different raw materials. When loading concrete and leaving the site, be sure to check the slump and workability of concrete in the tank, and be careful of early setting of concrete and segregation and precipitation of concrete.
四、盡量減少車(chē)輛行駛的時(shí)間
4、 Minimize vehicle travel time
混凝土運(yùn)輸距離一般在半徑20范圍以?xún)?nèi),出車(chē)之前規(guī)劃好行車(chē)路線(xiàn)以及車(chē)輛性能情況,盡量減少車(chē)輛在路上的行駛時(shí)間。
The concrete transportation distance is generally within a radius of 20km. The driving route and vehicle performance shall be planned before driving to minimize the driving time of vehicles on the road.
五、特殊情況為了減少損失先卸料
5、 Under special circumstances, in order to reduce the loss, unload the material first
如果遇人為或不可抗因素,導(dǎo)致長(zhǎng)時(shí)間無(wú)法卸料的情況,應(yīng)隨時(shí)查看罐內(nèi)混凝土情況,一旦發(fā)現(xiàn)混凝土開(kāi)始凝結(jié)。應(yīng)立刻進(jìn)行卸料,以防整個(gè)罐體凝罐報(bào)廢。
In case of failure to unload for a long time due to human or irresistible factors, check the concrete in the tank at any time. Once it is found that the concrete begins to set. Unloading shall be carried out immediately to prevent the whole condensate tank from being scrapped.

上一篇:攪拌車(chē)液壓油箱排氣管怎么加水?
下一篇:攪拌車(chē)生產(chǎn)出來(lái)的混凝土應(yīng)該符合哪些標(biāo)準(zhǔn)?