自動(dòng)攪拌車主要應(yīng)用于環(huán)境不是很好的施工地方,所以要求工作人員要正確使用該設(shè)備,如果使用不當(dāng)會(huì)損壞設(shè)備,甚于對(duì)自己產(chǎn)生隱患。那么工作人員應(yīng)該如何規(guī)范自動(dòng)上料自動(dòng)攪拌車的操作呢?
Automatic mixing truck is mainly used in construction places where the environment is not very good, so it requires the staff to use the equipment correctly, if improper use will damage the equipment, or even have hidden dangers for themselves. So how should the staff regulate the operation of automatic feeding automatic mixing truck?
操作自動(dòng)上料自動(dòng)攪拌車前,注意在裝料前排凈攪拌筒內(nèi)剩余的水和雜物。運(yùn)輸過程中要不停地轉(zhuǎn)動(dòng),防止混凝土離析。混凝土攪拌車到達(dá)工地卸料前,應(yīng)將攪拌筒以14-18轉(zhuǎn)/分的速度全速轉(zhuǎn)動(dòng)1-2分鐘,然后反向卸料。反轉(zhuǎn)前應(yīng)先停止攪拌筒,然后再開始反轉(zhuǎn)。工作時(shí),請(qǐng)勿將手伸入自動(dòng)上料攪拌車的攪拌筒內(nèi),嚴(yán)禁將手伸入主卸料槽與加長卸料槽的連接部位進(jìn)行攪拌,以免發(fā)生事故。
Before operation of automatic feeding and automatic mixing truck, pay attention to the remaining water and sundries in the mixing drum in the front row of loading. Keep turning during transportation to prevent concrete segregation. Before the concrete mixing truck arrives at the site for unloading, it should turn the mixing cylinder at the speed of 14-18 RPM for 1-2 minutes at full speed, and then reverse unloading. Stop stirring cylinder before reversing, and then start reversing. When working, do not put your hand into the mixing drum of the automatic feeding mixer truck. It is strictly forbidden to put your hand into the connecting part of the main discharging tank and the extended discharging tank to stir, so as to avoid accidents.
冬季施工應(yīng)做到:開機(jī)前檢查是否有結(jié)冰;下班時(shí)小心攪拌筒和供水系統(tǒng)中的殘水,關(guān)閉水泵開關(guān),將控制手柄置于“停止”位置。在工地卸貨后,立即用設(shè)備附帶的軟管沖洗進(jìn)料斗、卸料斗、卸料槽等,附著在車身上的污泥和混凝土。在返回?cái)嚢枵镜耐局校瑧?yīng)向攪拌筒內(nèi)注入150-200L的水,以筒壁和葉片粘結(jié)的混凝土殘?jiān)?/div>
Winter construction should be done: check whether there is ice before starting; When off duty, carefully remove the residual water in the mixing cylinder and water supply system, turn off the pump switch, and put the control handle in the "stop" position. After unloading at the site, immediately flush the feed hopper, discharge hopper, discharge trough, etc. with the hose attached to the equipment to remove the sludge and concrete attached to the car body. On the way back to the mixing station, 150-200L of water should be injected into the mixing cylinder to remove concrete residue bonded to the cylinder wall and blade.
另外,
自動(dòng)攪拌車周圍要用支架支撐,并且將自動(dòng)攪拌車放在堅(jiān)固的地方。自動(dòng)攪拌車在使用前要行檢查,確保設(shè)備控制器和各部件完好以后才可以正常運(yùn)行。自動(dòng)攪拌車的筒內(nèi)不能存在異物,否則會(huì)影響到后面的攪拌效果。如果現(xiàn)場(chǎng)需要維修,需要將自動(dòng)攪拌車的料斗固定好,斷電以后才可以進(jìn)行維護(hù)。如果要進(jìn)入到攪拌筒內(nèi),外面則需要有人員看管。
In addition, stand around the agitator and place the agitator in a firm place. Automatic mixing truck should be checked before use to ensure that the equipment controller and all parts are in good condition before normal operation. There can be no foreign matter in the cylinder of the automatic mixing truck, otherwise it will affect the mixing effect behind. If the site needs maintenance, it is necessary to fix the hopper of the automatic mixing truck, and only after the power is off can the maintenance be carried out. If you want to enter the mixing cylinder, the outside should be supervised.
正確使用自動(dòng)上料自動(dòng)攪拌車,有利于施工的順利進(jìn)行,可以提高工程工作的效率,所以說工作人員操作自動(dòng)攪拌車時(shí)要正確行事!更多內(nèi)容的了解就來網(wǎng)站
f3328.cn看看吧!
The correct use of automatic feeding automatic agitator is conducive to the smooth progress of construction and can improve the efficiency of engineering work, so the staff should act correctly when operating automatic agitator! For more information, please visit f3328.cn.
上一篇:自動(dòng)攪拌車在下雨天時(shí)要如何刮水?
下一篇:新買的水泥自動(dòng)攪拌車如何使用才能效率更久?