农村无码免费视频_天天操狠狠干夜夜做_成人aⅤ专区精品无码国产_美女18禁大胸裸身网站_午夜理理伦a级毛片a猛男_一级爱爱片欧美亚洲_国产精品阿v视频_亚洲狼人综合干_玉女阁福利精品导航_国产一区二区欧美日韩

您好,歡迎光臨萊州聚峰機(jī)械有限公司網(wǎng)站! 鄭重聲明 進(jìn)入官網(wǎng)

攪拌車發(fā)動(dòng)機(jī)的磨合方式

來(lái)源:http://f3328.cn/ 日期:2021-11-04 發(fā)布人:admin
冷磨合
Cold running in
冷磨合可以分成無(wú)壓縮磨合和壓縮磨合兩個(gè)步驟,無(wú)壓縮冷磨合時(shí),要拆下噴油器;壓縮冷磨合時(shí)則需要裝上噴油器或者控制減壓結(jié)構(gòu)。
Cold running in can be divided into two steps: non compression running in and compression running in. When non compression cold running in, remove the fuel injector; During compression cold running in, an injector or a pressure reducing structure shall be installed.
冷磨合時(shí),要以外力帶動(dòng)發(fā)動(dòng)機(jī)運(yùn)轉(zhuǎn),整個(gè)過(guò)程不能有柴油供給,而且要隨時(shí)觀察機(jī)油壓力,檢查氣門室內(nèi)有沒(méi)有潤(rùn)滑油流動(dòng),同時(shí)水溫要控制在40℃,注意各部位有沒(méi)有異常響聲,如果有的話,要立即停機(jī)檢查,排除故障。冷磨合后要放出磨合油,清洗整個(gè)的潤(rùn)滑油管路系統(tǒng)。
During cold running in, the engine shall be driven by external force. There shall be no diesel supply in the whole process. In addition, the oil pressure shall be observed at any time to check whether there is lubricating oil flow in the valve chamber. At the same time, the water temperature shall be controlled at 40 ℃, and pay attention to whether there is abnormal noise in various parts. If there is any, stop the machine immediately for inspection and troubleshooting. After cold running in, drain the running in oil and clean the whole lubricating oil pipeline system.
自動(dòng)攪拌車
無(wú)負(fù)荷熱磨合
No load thermal running in
向混凝土攪拌車發(fā)動(dòng)機(jī)油底殼加入足量的清潔磨合油,檢查調(diào)整氣門間隙和供油提前角,排出燃油系統(tǒng)中的空氣,然后啟動(dòng)發(fā)動(dòng)機(jī),在冷卻系統(tǒng)水溫達(dá)到40℃以上時(shí),提高發(fā)動(dòng)機(jī)轉(zhuǎn)速,并隨時(shí)注意發(fā)動(dòng)機(jī)各缸的運(yùn)轉(zhuǎn)情況。
Add enough clean running in oil to the engine oil pan of the concrete mixer truck, check and adjust the valve clearance and oil supply advance angle, discharge the air in the fuel system, then start the engine, increase the engine speed when the water temperature of the cooling system reaches more than 40 ℃, and pay attention to the operation of each cylinder of the engine at any time.
負(fù)荷熱磨合
Load thermal running in
穩(wěn)定發(fā)動(dòng)機(jī)轉(zhuǎn)速,慢慢增加負(fù)荷,持續(xù)運(yùn)轉(zhuǎn)一個(gè)半小時(shí),檢查各部位是否有漏油、漏水、漏氣等現(xiàn)象,水溫、油壓是否正常,攪拌車發(fā)動(dòng)機(jī)是否有異響或者異常。如果有及時(shí)熄火進(jìn)行排查。發(fā)動(dòng)機(jī)熱磨合完畢后,應(yīng)再次檢查調(diào)整氣門間隙,待發(fā)動(dòng)機(jī)溫度降低后,按規(guī)定力矩緊固氣缸蓋螺母。
Stabilize the engine speed, slowly increase the load, operate continuously for one and a half hours, check whether there is oil leakage, water leakage, air leakage and other phenomena at all parts, whether the water temperature and oil pressure are normal, and whether the mixer engine has abnormal noise or abnormality. If there is, shut down the engine in time for troubleshooting. After the hot running in of the engine, check and adjust the valve clearance again. After the engine temperature decreases, tighten the cylinder head nut according to the specified torque.
優(yōu)化調(diào)整
Optimization and adjustment
保證柴油機(jī)正確的配氣相位,定期檢查氣門間隙,測(cè)量時(shí)要注意順著搖臂方向插入厚薄規(guī),只有正確調(diào)整氣門間隙才能使氣缸內(nèi)限度的充滿新鮮空氣、排出廢氣,并且減少氣門積碳。
Ensure the correct valve timing of the diesel engine, regularly check the valve clearance, and pay attention to inserting a thickness gauge along the rocker arm during measurement. Only by correctly adjusting the valve clearance can the cylinder be filled with fresh air, exhaust gas and reduce valve carbon deposition.
磨合期對(duì)于確保車輛運(yùn)轉(zhuǎn)狀態(tài),延長(zhǎng)車輛使用壽命,排除故障隱患是非常重要的一個(gè)時(shí)期,尤其是負(fù)荷很大的混凝土攪拌車,如果在磨合期內(nèi)直接進(jìn)行正常作業(yè),很容易導(dǎo)致車輛各組件因?yàn)槟ズ喜坏轿欢霈F(xiàn)各種故障,影響車輛的運(yùn)轉(zhuǎn),所以在磨合期內(nèi)一定不要滿負(fù)荷運(yùn)作,避免車輛受損。
The running in period is a very important period for ensuring the running in state of the vehicle, prolonging the service life of the vehicle and eliminating hidden troubles. In particular, if the concrete mixer with large load is operated normally directly during the running in period, it is easy to cause various faults of various components of the vehicle due to inadequate running in, affecting the operation of the vehicle, Therefore, do not operate at full load during the running in period to avoid damage to the vehicle.
本文的內(nèi)容是由自動(dòng)攪拌車給您提供,我們專注客戶需求,不斷的發(fā)展,為客戶提供更多的服務(wù),詳情可參考我們的網(wǎng)站:http://f3328.cn
The content of this article is provided to you by the automatic mixer. We focus on customer needs, continue to develop and provide customers with more services. For details, please refer to our website: http://f3328.cn

上一篇:攪拌車燃油系統(tǒng)保養(yǎng)需要注意什么?
下一篇:水泥攪拌車干燥罐到底多久更換一次?