自動攪拌車發(fā)動機散熱器是一個非常重要的組件。我們來討論散熱器的使用和維護。
The radiator of the engine is a very important component of the automatic loading mixer. Let's talk about the use and maintenance of radiators.
1.軟化后,建議使用軟水和硬水,以防止內部堵塞和水垢形成。
1. After softening, it is recommended to use soft water and hard water to prevent internal blockage and scale formation.
2.安裝散熱器時,請勿損壞散熱器(切片)和保險杠散熱器。這確保了散熱和密封。
2. When installing radiator, do not damage radiator (slice) and bumper radiator. This ensures heat dissipation and sealing.
3.使用防凍液時,請使用常規(guī)廠家生產的長期防銹防凍液,并符合標準,避免散熱器腐蝕。
3. When using antifreeze, please use the long-term anti rust antifreeze produced by conventional manufacturers and comply with national standards to avoid radiator corrosion.
4.備用散熱器的有效環(huán)境必須保持通風和干燥。
4. The effective environment of the standby radiator must be kept ventilated and dry.
5.日常使用時,應經常檢查水位,冷卻后停水。加水時,慢慢打開水箱蓋。保持操作員的身體盡可能遠離進水口,以防止高壓蒸汽和灼傷。
5. In daily use, the water level should be checked frequently and the water should be stopped after cooling. When adding water, slowly open the water tank cover. Keep the operator's body as far away from the water inlet as possible to prevent high pressure steam and burns.
自動攪拌車是如何使用和維護發(fā)動機的散熱
How to use and maintain the heat dissipation of the engine for the automatic feeding mixer
6.自動攪拌車散熱器不應接觸酸,堿或其他腐蝕性物質。
6. The radiator of automatic feeding mixer shall not contact with acid, alkali or other corrosive substances.
7.水位計應每3個月或根據實際情況清洗一次。必須拆下零件并用溫水和非腐蝕性清潔劑清潔。
7. The water level gauge should be cleaned every 3 months or according to the actual situation. Parts must be removed and cleaned with warm water and a non corrosive cleaner.
8.在冬季,使用水箱蓋和排水開關釋放所有水,以防止因長期停車和間接停車等因凍結導致的核心凍結。
8. In winter, use water tank cover and drain switch to release all water to prevent core freezing caused by freezing due to long-term shutdown and indirect shutdown.
9.根據實際情況,用戶需要徹底清潔散熱器1-3個月。清潔時,沿對面入口用清水沖洗。
9. According to the actual situation, the user needs to clean the radiator thoroughly for 1-3 months. When cleaning, rinse with water along the opposite entrance.
10.當散熱器完全排空并充滿時,關閉發(fā)動機缸體上的排水開關。當水流出時,再次關閉以防止起泡。
10. When the radiator is completely drained and full, first turn off the drain switch on the engine block. When water flows out, close again to prevent foaming.
This article is supported by Zhongke Jufeng mixer. For more details, please click our website http://f3328.cn We will provide you with satisfactory service wholeheartedly.
上一篇:全自動攪拌車罐體容積變小預防方式
下一篇:使用水泥自動攪拌車為什么別超載?