攪拌車(chē)的正確操縱流程及使用事項(xiàng)

來(lái)源:http://f3328.cn/ 日期:2023-02-20 發(fā)布人:admin
Correct operation process of cement automatic mixer
一、水泥自動(dòng)攪拌車(chē)啟動(dòng)前應(yīng)對(duì)機(jī)器體系各部位認(rèn)真舉行搜檢,確認(rèn)良好后方可啟動(dòng)。
1、 Before starting the automatic cement mixer truck, the parts of the machine system shall be carefully searched and inspected, and the truck can be started only after it is confirmed to be in good condition.
二、啟動(dòng)前,應(yīng)將攪拌駕馭桿放在“空檔”地位。
2、 Before starting, the mixing lever should be placed in the "neutral" position.
三、啟動(dòng)后,應(yīng)將攪拌駕馭桿放在“卸料”地位,放去筒內(nèi)積水。
3、 After starting, the mixing control rod should be placed in the "unloading" position to remove the water in the cylinder.
四、裝料時(shí),攪拌操縱桿應(yīng)放在“裝料”地位。
4、 When loading, the mixing control lever should be placed in the "loading" position.
五、運(yùn)輸前,卸料槽務(wù)必固定在“行駛”地位,防止擺動(dòng)。
5、 Before transportation, the discharge chute must be fixed in the "driving" position to prevent swinging.
水泥自動(dòng)攪拌車(chē)
六、操縱駕馭桿時(shí),應(yīng)在“空檔”地位稍作停留后方可動(dòng)下一個(gè)地位。
6、 When operating the driving lever, you should stay in the "neutral" position for a while before moving to the next position.
七、搞好文明施工,桶內(nèi)多余質(zhì)料禁止隨意亂倒。卸料后務(wù)必對(duì)攪拌筒、料槽、托輥等部位舉行沖洗。
7、 Do a good job in civilized construction, and do not dump the surplus materials in the bucket at will. After discharging, the mixing drum, material trough, idler and other parts must be washed.
八、人進(jìn)入筒內(nèi)砼結(jié)塊時(shí),應(yīng)將車(chē)輛熄火,拔下電門(mén)鑰匙,筒外設(shè)人監(jiān)護(hù)。
8、 When people enter the cylinder to remove concrete lumps, the vehicle shall be turned off, the switch key shall be removed, and a person shall be set outside the cylinder to monitor.
攪拌車(chē)的使用事項(xiàng)
Precautions for safe use of mixing truck
攪拌車(chē)在運(yùn)輸水泥時(shí),要包管滑斗放置牢靠,防止因松動(dòng)造成擺動(dòng),能手進(jìn)中打傷行人或影響別的車(chē)輛平常運(yùn)行。攪拌車(chē)裝運(yùn)攪拌好的水泥時(shí),攪拌筒轉(zhuǎn)速為2-10轉(zhuǎn)/分,在運(yùn)輸過(guò)程當(dāng)中,平整路面上攪拌筒轉(zhuǎn)速包管在2-3轉(zhuǎn)/分,行駛在側(cè)傾坡度大于50的路面,或擺布晃悠較大的路面時(shí),應(yīng)休止攪拌扭轉(zhuǎn),待路況好轉(zhuǎn)后再恢復(fù)攪拌扭轉(zhuǎn)。
When transporting cement, the mixing truck shall ensure that the pipe sliding bucket is placed firmly to prevent swinging due to looseness, hurting pedestrians or affecting the normal operation of other vehicles. When the mixing truck is transporting the mixed cement, the mixing drum speed is 2-10 rpm. During the transportation, the mixing drum speed is guaranteed to be 2-3 rpm on the flat road. When driving on the road with a side slope greater than 50, or swaying the road with a large slope, the mixing torsion should be stopped, and the mixing torsion should be resumed after the road condition improves.
水泥自動(dòng)攪拌車(chē)輸送水泥的時(shí)間不可以超過(guò)攪拌站劃定的時(shí)間。輸送水泥途中,攪拌筒不得長(zhǎng)時(shí)間停轉(zhuǎn),以防水泥產(chǎn)生離析征象。司機(jī)應(yīng)時(shí)常調(diào)查水泥環(huán)境,發(fā)現(xiàn)異常及時(shí)通報(bào)調(diào)劑室,請(qǐng)求做來(lái)由分。水泥自動(dòng)攪拌車(chē)內(nèi)裝有水泥時(shí),在現(xiàn)場(chǎng)窒礙時(shí)間不得超過(guò)1小時(shí),如超時(shí)應(yīng)登時(shí)要求現(xiàn)場(chǎng)負(fù)責(zé)人賜與及時(shí)處分。
The time for automatic cement mixer to transport cement shall not exceed the time specified by the mixing station. During the transportation of cement, the mixing drum shall not be stopped for a long time to prevent segregation of cement. The driver should always investigate the cement environment, report any abnormality to the mixing room in time and ask for the reason. When the automatic cement mixer truck is loaded with cement, it shall not be obstructed on the site for more than 1 hour. If it exceeds the time limit, the person in charge of the site shall be asked to give timely punishment.
水泥自動(dòng)攪拌車(chē)輸送水泥塌落度不得低于8cm。從水泥入罐到排擠,氣溫高時(shí)不得超過(guò)2小時(shí)務(wù)必排擠,陰雨天色溫度低時(shí),不得超過(guò)2.5小時(shí)。攪拌車(chē)在排擠水泥之前,應(yīng)使攪拌筒在10-12轉(zhuǎn)/分的轉(zhuǎn)速下滾動(dòng)1分鐘,再舉行排料。更多有關(guān)設(shè)備事項(xiàng)就來(lái)我們網(wǎng)站http://f3328.cn咨詢!
The slump of cement conveyed by automatic cement mixer shall not be less than 8cm. From cement entering the tank to squeezing, it shall not exceed 2 hours when the temperature is high, and it shall not exceed 2.5 hours when the temperature is low in rainy weather. Before the mixing truck squeezes the cement, the mixing drum shall be rolled for 1 minute at the speed of 10-12 rpm before discharging. For more equipment matters, please visit our website http://f3328.cn consulting service

上一篇:自上料水泥攪拌車(chē)使用期間的省油小技巧