應(yīng)做好設(shè)備的日常檢查,檢查主
自上料水泥攪拌車油泵的相關(guān)情況,確認是否需要添加潤滑脂。所有潤滑點均應(yīng)按制造商的設(shè)計要求進行潤滑;主要潤滑點有:卸料門軸、儲料斗和稱重斗軸、壓輥和皮帶輸送機托輥、軸承和托輥、傳動鏈、大齒輪等。
The daily inspection of the equipment shall be carried out to check the relevant conditions of the manual (self) oil pump of the main self-contained cement mixer and confirm whether it is necessary to add grease. All lubrication points shall be lubricated according to the design requirements of the manufacturer; The main lubrication points include: unloading gate shaft, storage hopper and weighing bucket shaft, pressure roller and belt conveyor idler, bearing and idler, transmission chain, big gear, etc.
每天檢查設(shè)備的工作情況,打開儲氣罐底部的排水閥,將里面的水排掉。檢查氣壓是否符合制造商的設(shè)計要求。檢查電氣接觸器,確認繼電器上的靜、動觸點是否完好,必要時拆下更換。檢查自裝式水泥攪拌機主機皮帶的張緊和磨損情況,保證主機正常運轉(zhuǎn)。
Check the working condition of the equipment every day, open the drain valve at the bottom of the air tank and drain the water inside. Check whether the air pressure meets the manufacturer's design requirements. Check the electrical contactor, confirm whether the static and dynamic contacts on the relay are intact, and remove and replace them if necessary. Check the tension and wear of the belt of the main machine of the self-contained cement mixer to ensure the normal operation of the main machine.
水泥攪拌機廠家認為,需要對攪拌臂、葉片、刮板等易磨損件和備件進行檢查,并根據(jù)檢查結(jié)果進行必要的間隙調(diào)整。磨損嚴重時,及時更換。檢查振動器上的連接螺栓是否松動,必要時擰緊。還有很多。
The manufacturer of self-contained cement mixer believes that it is necessary to check the easily worn parts and spare parts such as mixing arm, blade and scraper, and make necessary gap adjustment according to the inspection results. In case of serious wear, replace it in time. Check whether the connecting bolts on the vibrator are loose and tighten them if necessary. There are still a lot of it.
水泥攪拌車所有設(shè)備安裝完畢,連接電氣控制系統(tǒng),并經(jīng)業(yè)主及供應(yīng)商相關(guān)人員驗收合格后,由機電人員共同進行調(diào)試。測試的目的是確認設(shè)備是否安裝成功,與電控系統(tǒng)的連接是否正確,機電設(shè)備的性能和經(jīng)濟技術(shù)指標是否符合合同要求。
After the installation of all equipment of the dump cement mixer truck is completed, the electrical control system shall be connected, and the commissioning shall be carried out jointly by the electromechanical personnel after being accepted by the relevant personnel of the owner and the supplier. The purpose of the test is to confirm whether the equipment is successfully installed, whether the connection with the electric control system is correct, and whether the performance and economic and technical indicators of electromechanical equipment meet the requirements of the contract.
另外,在稱重斗上焊接時,必須斷開控制電源,將傳感器短路或?qū)⒑笝C的地線直接放在稱重斗上,以免電流過大造成焊接損壞在此過程中通過傳感器。寮式傳感器(S型)安裝好后,需要擰緊鎖緊螺母,懸吊螺釘不能堵住傳感器槽,即懸吊螺釘與傳感器之間應(yīng)有10mm左右的間隙槽。
In addition, when welding on the weighing bucket, you must disconnect the control power supply, short circuit the sensor or place the ground wire of the welding machine directly on the weighing bucket to avoid welding damage caused by excessive current. In this process, you must pass through the sensor. There should be a 10mm gap between the left and right suspension screws of the sensor, i.e. the S-shaped screws should not be tightened to block the installation of the sensor.
自上料水泥攪拌車計量系統(tǒng)的維護事項便是這樣了,你可以關(guān)注我們的網(wǎng)站
f3328.cn進行咨詢!
This is the maintenance of the metering system of the loading cement mixer. You can pay attention to our website www.sdzkjf.com Cn for consultation!
上一篇:水泥自動攪拌車前兩塊鋼板容易折斷的原因