1、在施工現(xiàn)場(chǎng)卸料完畢后,應(yīng)立即用自上料攪拌車(chē)隨帶的軟管沖洗進(jìn)料斗、出料斗、卸料溜槽等處,粘附在車(chē)身各處的污泥及混凝土。在返回?cái)嚢枵镜耐局?,?yīng)向攪拌筒內(nèi)注150---200L水以清洗筒壁及葉片粘結(jié)的混凝土殘?jiān)?/span>
1. After unloading at the construction site, the feeding hopper, discharging hopper, discharging chute, etc. shall be washed immediately with the hose attached to the loading mixer to remove the sludge and concrete adhered to the body. On the way back to the mixing plant, 150-200l water should be injected into the mixing drum to clean the concrete residue bonded on the wall and blades of the drum.
2、每天工作結(jié)束后,司機(jī)應(yīng)負(fù)責(zé)向攪拌筒內(nèi)注入清水并高速(14—18轉(zhuǎn)/分)旋轉(zhuǎn)5—10分鐘,然后將水排去,以保障筒內(nèi)清潔。用高壓水清洗攪拌筒各個(gè)部分時(shí),應(yīng)注意避開(kāi)儀表及操縱桿等部位。壓力水噴嘴與車(chē)身油漆表面間的距離不得小于40厘米。
2. At the end of each day's work, the driver shall be responsible for injecting clean water into the mixing drum and rotating at high speed (14-18 RPM) for 5-10 minutes, and then draining the water to ensure the cleanness of the drum. When using high-pressure water to clean each part of the mixing drum, attention should be paid to avoid the instrument and control rod. The distance between the pressure water nozzle and the body paint surface shall not be less than 40 cm.
3、攪拌筒內(nèi)外積污及殘存的混凝土渣塊時(shí),以及在機(jī)修人員進(jìn)入筒內(nèi)進(jìn)行檢修和焊補(bǔ)作業(yè)時(shí),需先關(guān)閉自上料攪拌車(chē)發(fā)動(dòng)機(jī),使攪拌筒完全停止轉(zhuǎn)動(dòng)。在機(jī)修人員進(jìn)入筒內(nèi)工作期間,應(yīng)該保障拌筒內(nèi)通風(fēng)良好,空氣新鮮,無(wú)可然氣體及有害灰塵,氧氣供應(yīng)充足。在筒內(nèi)使用電動(dòng)工具操作時(shí),操作人員應(yīng)該有良好的絕緣保護(hù)。
3. When removing the dirt and residual concrete slag inside and outside the mixing drum, and when the maintenance personnel enter the drum for repair and welding, the engine of the self feeding mixing truck should be shut down to stop the mixing drum completely. During the working period, the maintenance personnel should ensure that the mixing cylinder is well ventilated, the air is fresh, there is no natural gas and harmful dust, and the oxygen supply is sufficient. When using electric tools in the cylinder, operators should have good insulation protection.
4、工作時(shí),不得將手伸入旋轉(zhuǎn)的攪拌筒內(nèi),嚴(yán)禁將手伸入主卸料溜槽和加長(zhǎng)卸料溜槽的連接部位自動(dòng),工作人員如何規(guī)范操作自上料攪拌車(chē)以免發(fā)生事故。
4. When working, it is not allowed to put your hand into the rotating mixing drum. It is strictly forbidden to put your hand into the connecting part of the main discharge chute and the extended discharge chute. How to standardize the operation of the self loading mixer truck to avoid accidents.